loader
Yaal Vayupahavahan (4)

Upper Lemastota(1MW)

The Upper Lemastota Hydro Project; commissioned for operation in 2016, is a Hydro Power Plant with the capacity of 1 Mega Watt, located in Lemastota, Nikapotha; within close proximity to the Lemastota Oya energy source.

The plant features a specification of a Synchronous Generator. Cutting edge centralized monitoring and command centres closely track output and make required adjustments with minimal human intervention thus ensuring uncompromised power generation efficiency.

When operating at peak efficiency, the project will make a saving of 720 metric tonnes of CO₂ emissions per annum.

 

Technical Specification
Capacity1 MW
Project Location
Lemastota,
Nikapotha, Sri Lanka
Energy Source
Lemastota Oya
Generator TypeSynchronous Generator
Number of generating units
1
Commissioned Year
2016